A twelve-person practice working across housing, cultural and adaptive-reuse projects. We start with the site, the light and the budget — in that order.
Every project begins with a week on site and nothing drawn. We measure the light, walk the approach at three different hours, and read the constraints the survey does not carry — the neighbour's window, the way rain leaves the roof, what the client actually does on a Sunday. The drawing that follows is short because the thinking was long. Forty-one buildings later the method has not changed: fewer moves, better made, detailed to outlast the people who commissioned them.
Registered practice, RIBA Chartered — all four directors, not just the founding partner.
One team from first sketch to handover. The person who drew it is on site when it is built.
Fee agreed as a percentage of construction cost, published in the proposal before you sign.
01Selected workIndex 2014 — 2026
Forty-one built projects.
Verdant House
Sussex Downs — 2023
A chalk-white family house set into a south-facing slope, half-buried so the roofline never breaks the ridge. Rammed-earth walls from spoil dug on site; a single clerestory runs the length of the plan and does all the lighting work.
The original brass-casting hall, re-glazed and left otherwise alone.
The Long Room, Copenhagen
Thirty metres of vaulted reading room, top-lit end to end.
Verdant House, Sussex
Rammed earth, lime render, one continuous clerestory.
Quarry Studios, Snowdonia
Six studios stepped into the slate, each with a north light.
03DisciplinesFour
What we take on.
01
Architecture
New-build housing, cultural and civic work from feasibility through to handover. We take the project all the way; we do not hand it to a delivery architect at stage four.
02
Interiors
Rooms designed with the building, not after it. Joinery, lighting and material schedules drawn in-house and specified to named suppliers so the tender is honest.
03
Adaptive reuse
Listed and industrial buildings brought back into use. Heritage statements, consent negotiation and the structural sequencing that decides whether a reuse is viable at all.
04
Masterplanning
Ten to four hundred homes. Block structure, movement and public realm tested against daylight, overlooking and viability before a single elevation is drawn.
04To dateAudited figures
Buildings completed
41
Years in practice
17
Awards and commendations
9
Work from repeat clients or referral
84%
05DetailStudio archive
Joint, edge, reveal.
06MethodFive stages
How a project runs.
01/
Site and brief
A week on site, a measured survey, and a written brief we both sign. No drawings yet — the brief is the drawing that matters most.
02/
Feasibility
Two or three tested options with an order-of-cost against each. You choose a direction knowing what it costs, not after.
03/
Design development
The chosen option resolved to planning stage, with the consultant team appointed and the material palette fixed on real samples.
04/
Consent and tender
We run the planning application and the tender. Three contractors, one comparable specification, a written recommendation.
05/
On site
Weekly visits, monthly valuations, one point of contact. Handover includes an as-built set and a year-one defects walk.
“The plan is almost boringly simple. Everything interesting has been spent on the section, on the light, and on how the building meets the ground.”
Architects’ Journal
On Verdant House, Building of the Month
07RecognitionSelected
Awards.
RIBA Regional Award
Royal Institute of British Architects · 2024
Building of the Month
Architects’ Journal · 2023
Adaptive Reuse, shortlist
Civic Trust Awards · 2025
Low-Carbon Housing, commended
Structural Timber Awards · 2022
Have a site, or a building you are unsure about?
The first conversation is an hour, on site or on a call, and costs nothing. We will tell you if the project is not worth doing.